[1]
Wiyanto, A. and Santosa, B. 2026. Analisis Kelayakan Investasi Proyek EPC Pengembangan Coal Handling Facility (CHF) Rail Loop Serta Train Loading System (TLS) 6 Dan 7. JIBEMA: Jurnal Ilmu Bisnis, Ekonomi, Manajemen, dan Akuntansi. 4, 1 (Jul. 2026), 1652–1663. DOI:https://doi.org/10.62421/jibema.v4i1.599.