Wiyanto, A., & Santosa, B. . (2026). Analisis Kelayakan Investasi Proyek EPC Pengembangan Coal Handling Facility (CHF) Rail Loop Serta Train Loading System (TLS) 6 Dan 7. JIBEMA: Jurnal Ilmu Bisnis, Ekonomi, Manajemen, Dan Akuntansi, 4(1), 1652–1663. https://doi.org/10.62421/jibema.v4i1.599