Wiyanto, A. and Santosa, B. . (2026) “Analisis Kelayakan Investasi Proyek EPC Pengembangan Coal Handling Facility (CHF) Rail Loop Serta Train Loading System (TLS) 6 Dan 7”, JIBEMA: Jurnal Ilmu Bisnis, Ekonomi, Manajemen, dan Akuntansi, 4(1), pp. 1652–1663. doi: 10.62421/jibema.v4i1.599.